This is actually the very first delivery to some store since modifications were being built. The shop was in-built 2009 with some design flaws getting evident. We have been asked by the Administration corporation to supply guidance regarding how to rectify these. We encouraged that one of several 90° bends during the delivery pipe was taken out to